Overburden Stress Arch Elevation Effect Induced by Roof Cutting and Destress Technique in Coal Mine Longwall Panel and Its Control Mechanism to Entry Surrounding Rock

Jinzhao Liu,Dongyin Li,Xiangjun Chen,Shen Wang,Haitao Wang,Yongjia Xu
DOI: https://doi.org/10.1007/s42461-023-00798-y
2023-07-11
Abstract:The safe and efficient driving of the roadway along the gob is becoming an increasing challenge due to the influence of the integrity and bearing capacity of the side coal and rock mass in the gob under the roof cutting mining mode. The mechanism of protection of the gob-side roadway is shown by modeling the influence of roof cutting and the application of a destress technique on the lateral coal and rock mass zones. The distribution characteristics of stress, displacement, and fracture in the overburden are analyzed by numerical simulation method under the three working conditions. The results indicate (1) construction of row holes and blasting can form artificial structure’s fracture plane above the roadway, which can effectively cut the connection of overburden. The artificial structure’s fracture plane decreases the peak value of the lateral coal body’s support pressure. The peak point and the critical location of the stress reduction area are both transferred to the deep part at the same time, providing adequate space for the gob-side roadway. (2) The stress arch foot in the lateral rock mass rises to the rock layer at the bottom of the roof cutting plane after top cutting, as does the high-pressure area of deviator stress. The fracture plane prevents lateral coal and rock mass instability and limits the negative effects of roof deformation above the gob-side roadway. (3) The triangle slip fracture zone moves to over the roof cutting drilling zone due to the fracture plane, showing a high position compared to its original zone.
mining & mineral processing,metallurgy & metallurgical engineering
What problem does this paper attempt to address?