Internal risk assessment of whole process engineering consulting consortium based on GRA-TOPSIS-FMEA

Jinjian Du,Jianyu Chu
DOI: https://doi.org/10.21595/jmai.2023.23427
2023-06-26
Journal of Mechatronics and Artificial Intelligence in Engineering
Abstract:In order to select key risk factors, effectively control risks, and promote the smooth development of the whole process of engineering consulting consortium, Based on WBS-RBS risk identification in the whole process of engineering consulting, this paper introduces FMEA model, applies rough set and binary semantics to evaluate risk from multiple dimensions of occurrence, severity and difficulty to detect, and uses G1-improved CRITIC to calculate the comprehensive weight of risk evaluation factors, and then severity is revised based on DEMATEL. The GRA-TOPSIS model is constructed for risk ranking. Finally, the model is applied to a road network project and the analysis shows that communication and coordination risk, termination risk and schedule risk are the key risks. The model is suitable for risk assessment in the joint body and provides a feasible method for risk control in the whole process of engineering consulting consortia.
English Else
What problem does this paper attempt to address?