Development of an Inspection, Maintenance and Rehabilitation System for Bridge Infrastructures Using Integrated Building Information Modeling, Web Server and QR-Code Technologies: A Case Study of Sadr Bridge
Mohammad Rasoulimanesh,Alireza Rahai,Vahid Shahhosseini
DOI: https://doi.org/10.1007/s40999-024-01052-2
IF: 2.184
2024-12-12
International Journal of Civil Engineering
Abstract:This paper examined the synergistic integration of the Bridge Management System (BMS) into Building Information Modeling (BIM), a robust online database, and Quick Response (QR) code technology to enhance the efficiency and reliability of bridge infrastructure management. The integrated framework leveraged BIM's 3D modeling capabilities, a comprehensive online database for data storage and retrieval, and QR code technology for real-time tracking and monitoring of bridge components. Through a systematic review of the literature, a novel framework was introduced that streamlines bridge maintenance, inspection, and lifecycle management. The potential benefits, including improved asset management, predictive maintenance, and cost savings were discussed, while implementation challenges and barriers were addressed. To verify the developed framework, it was applied to a case study (Sadr Bridge). Subsequently, a questionnaire was administered to project employees. The survey results demonstrated that the participants believed the proposed framework effectively enhanced facility management (FM) practices, receiving high ratings across various metrics, particularly in budget allocation (4.73 out of 5). Key performance indicators (PIs) based on experts' opinions showed significant improvements, including a 17% reduction in maintenance costs, an 8% decrease in inspection overwork, a 23% reduction in inspection time, and a 41% reduction in paperwork. Overall, the framework substantially improved the accuracy and efficiency of FM practices. In conclusion, experts believed that the framework was more effective and accurate in bridge maintenance compared to traditional bridge management approaches. It offered potential for labor savings and budget optimization and can significantly reduce inspection time.
engineering, civil