Assessing geomorphic and hydraulic changes related to an unplanned reconnection of the middle Mississippi River and its floodplain near Miller City, Illinois, USA

Jonathan W.F. Remo,Tara L. Giri
DOI: https://doi.org/10.2139/ssrn.4569261
IF: 4.406
2024-01-15
Geomorphology
Abstract:The 2016 Len Small Levee breach and the decision not to repair this breach provides a unique opportunity to study the geomorphic and hydraulic changes associated with floodplain reconnection along a large (~30 km long) meander of the Mississippi River known as Dogtooth Bend. This study evaluates recent geomorphic, hydraulic, and sediment-transport capacity changes related to the breaching of the Len Small Levee and the development of cutoff channels across the neck of Dogtooth Bend. We also assess actions undertaken to mitigate further development of cutoff channels across Dogtooth Bend. To address these goals, we perform geomorphic change detection (GCD) analysis and hydrodynamic modeling to assess the geomorphic and hydraulic changes within both the Mississippi's river-connected floodplain and channel. GCD analysis using digital elevation models (DEMs) of the floodplain from pre (2011) and post (2020) levee breach showed net deposition of 23 million tons (MT) of sediment across the reconnected portion of Dogtooth Bend floodplain alone and an additional 34 MT within the batture (the land between the channel's low-water elevation and the flood-mitigation levee). Converting these deposition masses to deposition rates indicates ~5.7 MT yr −1 of deposition within the river-connected floodplain, which is equivalent to ~6 % of the average annual suspended load (~89 MT yr −1 ) showing this floodplain area is currently a substantial sink for river-transported sediments. In 2021, the U.S. Army Corps of Engineers constructed a grade-control structure down gradient of the levee breach to inhibit the development of cutoff channels across the neck of Dogtooth Bend. Our modeling indicates the addition of this grade-control structure could decrease peak discharge by up to ~15 % and annual flow volume by half assuming channel conveyance remains similar to 2020 conditions. However, sediment-transport-capacity modeling revealed the decrease in flow across Dogtooth Bend attributed to the grade-control structure did not translate into an increase in sediment-transport capacity within the main channel. Assessment of critical shear stress of erosion for fine-grained cohesive materials across Dogtooth Bend suggests conditions favorable to scouring along the actively forming cutoff channels even with the grade-control structure in place. These observations taken together suggest the current river management efforts may not be sufficient in preventing a meander cutoff over the long-term.
geosciences, multidisciplinary,geography, physical
What problem does this paper attempt to address?