Microgrids Planning to Mitigate Utility Net-Load Ramping

Alireza Soofiabadi,Asghar Akbari Foroud
DOI: https://doi.org/10.1007/s40998-022-00577-3
2022-12-27
Iranian Journal of Science and Technology Transactions of Electrical Engineering
Abstract:The outage of the photovoltaic and load increase in the evening hours causes the steep ramp in the utility load curve. This paper investigates a multi-objective planning model to mitigate the utility net-load ramping while minimizing the microgrid's cost and enhancing reliability for both microgrids and the utility. There is a need for a long-term and permanent solution that considers microgrids' cost and reliability along with utility net-load ramp mitigation. In the proposed method, the utility increases the financial motivation of microgrids to mitigate the net-load ramping through the long-term expansion planning of the microgrids. The proposed method facilitates the utilization of renewable resources and energy storage systems through microgrids planning programs; it also evaluates the role and performance of dispatchable and non-dispatchable resources and energy storage systems in mitigating the utility net-load ramping. A scenario-based structure is proposed to model the uncertainties. The proposed method is analyzed in several operational and financial cases to analyze its effectiveness.
What problem does this paper attempt to address?