Application of BIM Technology in Project Construction Schedule Management

Yanqiu Zhang
DOI: https://doi.org/10.1007/978-981-16-7469-3_8
2022-01-01
Abstract:Construction schedule control is an important task in the actual construction management process of the project, and it plays a key role in the process of controlling the construction quality. As the organizational structure of the entire project, as well as the process of construction and implementation have become more complex, the actual investment amount of the project has also become greater, resulting in a huge waste of investment in the national economy and society. One of the reasons is due to the project. The management efficiency is low, so the progress of the project cannot be well controlled. Therefore, we are required to adopt more efficient technical means to improve the effectiveness of program management. At present, BIM is to achieve the goal of project control and management, and to achieve the most effective project, but it is still rarely used widely in its construction schedule, and it mainly focuses on practical analysis. In fact, BIM is relatively rarely used in engineering. This article explores and studies the practical application of BIM information technology in construction schedule control and management of construction projects, and analyzes and summarizes some of the problems existing in China's traditional construction schedule control and management on the basis of summarizing relevant documents. Then it analyzes some of the advantages and disadvantages introduced by the BIM information technology used in the construction schedule control and management of China's construction projects, and then builds the schedule control platform of China's BIM information technology in the construction of construction projects based on the above foundation. Finally, the number of people on a platform built by the platform was tested. The test results show that although the platform still has shortcomings, overall, the management system accounts for more than 32% of people with good engineering performance evaluation, generally 30% the above.
What problem does this paper attempt to address?