Evaluation of the implementation of occupational safety and health management systems on the ayana nort wing bali construction project

I Ketut Sutapa,Ni Kadek Sri Ebtha Yuni,I Nengah Darma Susila,I Gede Sastra Wibawa,I Made Anom Santiana
DOI: https://doi.org/10.21744/irjeis.v8n1.2034
2022-01-11
Abstract:Building construction projects have a high level of risk of work accidents, especially for workers in the field. Therefore, at the time of implementation of construction work, it is necessary to evaluate the implementation of occupational safety and health management system (SMK3) to provide a sense of security to workers in the field of this research aimed at evaluating SMK3. This research uses qualitative and quantitative methods to know the implementation of SMK3, by taking data by conducting structured interviews conducted on the building construction project Ayana Nort Wing Bali. Analysis conducted a descriptive analysis based on Government Regulation of the Republic of Indonesia No.50, 2012 advanced with 12 criteria containing 166 criteria elements. The result of this study is the application of PP No. 50 of 2012 for the advanced level of 92.89% categorized as satisfactory. In addition, there are 14 that have not been implemented. This the company that the evaluation level of occupational safety and health management system (SMK3) in the building construction project Ayana North Wing Bali is the level of application is very satisfactory for the project.
What problem does this paper attempt to address?