Underground production scheduling with ventilation and refrigeration considerations

Oluwaseun Ogunmodede,Patricio Lamas,Andrea Brickey,Gregory Bogin,Alexandra Newman
DOI: https://doi.org/10.1007/s11081-021-09682-4
IF: 2.619
2022-01-13
Optimization and Engineering
Abstract:Underground mine production scheduling determines when, if ever, activities associated with the extraction of ore should be executed. The accumulation of heat in the mine where operators are working is a major concern. At the time of this writing, production scheduling and ventilation decisions are not made in concert. Correspondingly, heat limitations are largely ignored. Our mixed-integer program maximizes net present value subject to constraints on precedence, and mill and extraction capacities with the consideration of heat using thermodynamic principles, while affording the option of activating refrigeration to mitigate heat accumulation. In seconds to hours, depending on the problem size (up to thousands of activities and 900 daily time periods), a corresponding methodology that exploits the mathematical problem structure provides schedules that maintain a safe working environment for mine operators; optimality gaps are no more than 15% and average less than half that for otherwise-intractable instances.
engineering, multidisciplinary,operations research & management science,mathematics, interdisciplinary applications
What problem does this paper attempt to address?