Causes of delays in construction projects in the Province of Aceh, Indonesia

Anita Rauzana,Wira Dharma
DOI: https://doi.org/10.1371/journal.pone.0263337
IF: 3.7
2022-01-28
PLoS ONE
Abstract:Implementations of construction projects in Indonesia, especially in Aceh Province, are often delayed. Time, quality, and cost are three important components of planning a construction project. The benchmark for a successful construction project is the project completion time being in accordance with the time period specified in the contract. In project implementation, there is often a risk of delays in completing construction projects that can cause losses and fines; therefore, it is necessary to know the risk factors potentially causing project delays. The purpose of this study was to identify the risk factors causing delays greatly affecting construction projects in Aceh Province. The data used in this study were questionnaire data distributed to 68 respondents. The data processing methods included validity tests, reliability tests, and the construction of descriptive statistics. Ultimately, 60 delay factors were obtained; of these, 30 risk indicators were included in the very influential category with a mode value of (= 5), 29 delay risk indicators were in the high influence category with a mode value of (= 4), and one indicator was included in the category of medium influence (= 3).
multidisciplinary sciences
What problem does this paper attempt to address?