A Study on Joint Dispatching of Water Resource of the Dam System in Haoshuichuan Watershed

Yi Ma,Wei Jiang Zhang
DOI: https://doi.org/10.4028/www.scientific.net/amm.170-173.2077
2012-05-01
Applied Mechanics and Materials
Abstract:On account of increasing contradiction between water for life, environment, agriculture and water supply in Haoshuichuan watershed, it constructs new projects for water diversion, pumping, transpiration and distribution on the base of current project layout. A unified deployment of water supply source is formed through 1 reservoir, 11 key dams and 15 medium-sized check dams which have been built in river basins. It establishes watershed water resources joint scheduling mode through application of optimization theory, and adopts MATLAB optimization toolbox for the solution of the model. The research result may provide decision-making basis for river basin agricultural layout, ecological restoration and sustainable economic development, also provide reference for joint scheduling of water sources in similar regions.
What problem does this paper attempt to address?