An iterated greedy algorithm for the large-scale unrelated parallel machines scheduling problem

Francisco J. Rodriguez,Manuel Lozano,Christian Blum,Carlos García-Martínez
DOI: https://doi.org/10.1016/j.cor.2013.01.018
2013-07-01
Abstract:In this work, we tackle the problem of scheduling a set of jobs on a set of unrelated parallel machines with minimising the total weighted completion times as performance criteria. The iterated greedy metaheuristic generates a sequence of solutions by iterating over a constructive heuristic using destruction and construction phases. In the last few years, iterated greedy has been employed to solve a considerable number of problems. This is because it is based on a very simple principle, it is easy to implement, and it often exhibits an excellent performance. Moreover, scalability for high-dimensional problems becomes an essential requirement for modern optimisation algorithms. This paper proposes an iterated greedy model for the above-mentioned scheduling problem to tackle large-size instances. The benefits of our proposal in comparison to existing metaheuristics proposed in the literature are experimentally shown.
computer science, interdisciplinary applications,engineering, industrial,operations research & management science
What problem does this paper attempt to address?