Remediating a Landslide Affected Well for Subsequent Abandonment - Challenges Overcome and Solutions Applied

Felicia Cirstian,Jason Patrick Sauter,Constantin Vintila,Gheorghe Albulescu,Cosmin Constantin Badescu,Maximilian Ene
DOI: https://doi.org/10.2118/207491-ms
2021-12-09
Abstract:Abstract Control/Tracking Number 21 ADIP-P-4946-SPE Abstract Description This paper will present a case study to describe the well integrity complications of an onshore gas well in Romania affected by a landslide event, the challenges overcome during the land consolidation/excavation around the well, and the remediation solution of the well's casings. After being severely affected by a landslide, the subject well stopped production having a surface deviation from the original position of 5m and a landslide plane at cca 25m. The primary scope of the project was to restore the integrity of the well in order to safely abandon the well so that people and environment were not exposed to risk or danger. The project was elaborated through a collaborative effort of multidisciplinary teams including company personnel, such as well integrity engineers, completion engineers, geologists, abandonment team members, civil engineers, HSSE and construction, as well as several service providers. As part of the Phase to consolidate the well's surrounding area, additional risk mitigations were identified through HAZID workshops and implemented, such as creating gas drainage shafts, utilizing ATEX equipment and cold cutting tools for casings, tools, and organizing Rescue People Services. These elements and more aspects were elements of safety included in the project to better assure the success. The project has several milestones, the first being the consolidation of the well surroundings using 33 cement pillar rings with a total diameter of 8m and depth of 32m. A gas relief column was necessary to ensure the gas infiltration was exhausted from the soil. Once the ring was formed around the well, the excavation commenced inside the ring, avoiding impact with the conductor pipe of the well. This activity posed notable HSSE challenges, requiring solutions derived from HAZID workshops based on evaluations of the various discipline teams and certified parties. Following the excavation, the planned casing remediation included cold cutting the casing using diamond encrusted equipment, due to the gas presence at the well area. Casing restoration was planned for use of bolts to reconnect the casings, thus preventing welding.
What problem does this paper attempt to address?