Novel Automated Light Foam Cementing Set-Up Brings Operational Efficiency to Major Operator in Norwegian North Sea Sector

Ann-Marie Ekwue,Antonio Bottiglieri,Yasser Haddad,Agnieszka Walania,Toby Harkless,Odd Egil Raugstad,Gianluca Ruggieri
DOI: https://doi.org/10.2118/208122-ms
2021-12-09
Abstract:Abstract As oil and gas operators are constantly looking for ways to increase efficiency in their operations, one area of well construction that is becoming increasingly popular is in the field of foam cementing. Foamed cement slurries are designed to have low density with relatively high compressive strength to enable operators accomplish their zonal isolation requirements. In addition, the enhanced slurry mobility of these energized fluids leads to a high displacement efficiency to ensure uniform cement coverage in the annulus. The use of foamed cement slurries particularly for top-hole sections in deep-water environments has increased over the past decade. For large volume jobs such as these, operators utilize the standard Automated Foam Cement System (AFCS) which comprises of high-pressure nitrogen pumps /converter and portable liquid nitrogen tanks. The AFCS automatically controls nitrogen and cement slurry based on the downhole rate and precisely maintains a desired foam cement density. For smaller volume jobs, the main constraint to deploying the standard AFCS is mainly rig deck space limitations, thus a "light foam package" was developed. The light package, fully developed in Norway, maintains the already well-established characteristics of automation from the standard AFCS; with the added benefit of minimizing footprint on board the rig with equipment which includes foam manifold, gas bottle rack and nitrogen control flow valve vs. the conventional liquid nitrogen tanks, pumps, and back up equipment. Other advantages of this set up include much faster rig up time due to smaller and lighter liftsimproved HSE benefits of eliminating liquid nitrogen handling; as well as limiting number of people required offshorefull job accuracy and automatic control with the utilization of mass flowmeters to measure nitrogen and cement rates with precisionrobust system with 100% redundancy of critical components This publication highlights the job details from a light foam job performed on a 30in conductor in a well on the Norwegian Continental Shelf, with the objective to cement the entire conductor length to seabed. This job was conducted in a field where numerous past cement jobs had failed to bring cement up to seabed and top up jobs with grout were the norm to achieve top of cement. With this simplified foam cementing process, the vision is that this kind of system set-up can make foam cementing a reality even in the most remote of locations and/or locations with small deck space, with reduced start-up costs.
What problem does this paper attempt to address?