A Case Study of Intelligent Manufacturing Control Based on Multi-agents System to Deal with Batching and Sequencing on Rework Context

Emmanuel Zimmermann,Hind Bril El Haouzi,Philippe Thomas,Rémi Pannequin,Mélanie Noyel,André Thomas
DOI: https://doi.org/10.1007/978-3-319-73751-5_6
2018-01-01
Abstract:Nowadays complex control systems are rising, and especially hybrid control architectures which are developed to face manufacturing control challenges that occur with the last industrial revolution and the emerging of industry 4.0. This work presents an application, on a testing platform, of a scheduling algorithm with multi-criteria objectives developed for the Acta-Mobilier company facing high rework rate. This algorithm will inscribe itself in a hybrid control system based on smart entities. The main objective is to validate the contribution of the proposed algorithm in a disturbed environment. The platform, implemented with a multi-agent system, allows measuring the reliability of the proposed algorithm used for a complex system in the particular case of high rework rate.
What problem does this paper attempt to address?