Abstract:As the core infrastructure of digital construction, Internet Data Center (DC) is not only the key node of massive data processing but also a large-energy consuming user in the power system. Considering the temporal and spatial transferability of data center load, this paper constructs a source-grid-load integrated planning model based on two-stage stochastic programming. The two-stage stochastic optimization model is established to minimize the annual comprehensive cost of system investment and operation, so as to optimize the economic and environmental benefits of the system. Finally, a simulation example is used to verify the effectiveness of the proposed method.