Research on a New Method of Industrial Park Load Forecasting Based on Typical User Load Characteristics

Bin Ding,Zhikun Xing,Bo Yuan,Fan Wang,Yuting Pan
DOI: https://doi.org/10.1109/ei252483.2021.9713205
2021-10-22
Abstract:Aiming at the conventional park power load forecasting process, predicting the future annual load based on the current annual load level and expert experience, this method has certain limitations. Based on the new trend of energy development, the load density index method and the load characteristic curve fitting method are used, and the corresponding load characteristic curve normalization model is established based on the load data of each typical user on a typical day, and the annual maximum load characteristic is considered. Draw the annual park load density prediction curve, and verify the prediction results based on the relevant actual data of a certain year in Shanghai, laying a foundation for the development of the park multi-energy complementary system.
What problem does this paper attempt to address?