Cost Estimation Model Using Modified Parameters for Construction Projects

Sae-Hyun Ji,Joseph Ahn,Hyun-Soo Lee,Kyeongjin Han
DOI: https://doi.org/10.1155/2019/8290935
IF: 1.843
2019-07-30
Advances in Civil Engineering
Abstract:Construction projects require huge amounts of capital and have many risk factors due to the unique industry characteristics. For a project to be successful, accurate cost estimation during the design phase is very important. Thus, this research aims to develop a cost estimation model where a modification method integrates influential factors with significant parameters. This study identified a modified parameter-making process, which integrates many influential factors into a small number of significant parameters. The proposed model estimates the cost using quantity-based modified parameters multiplied by their price. A case study was conducted with 24-residence building project, and the estimation accuracy of the suggested method and a CBR model were compared. The proposed model achieved higher overall cost-estimation accuracy and stability. A large number of influence factors can be modified as simple representatives and overcome the limitations of a conventional cost estimation model. The paper originality relates to providing a modified parameter-making process to enhance reliability of a cost estimation. In addition, the suggested cost model can actively respond to the iterative requirements of recalculation of the cost.
construction & building technology,engineering, civil
What problem does this paper attempt to address?