The analysis of supply chain risk logistics in implementation of West Sumatera - Riau toll road development

Yosritzal,B M Adji,F Rizola
DOI: https://doi.org/10.1088/1755-1315/340/1/012044
2019-10-07
IOP Conference Series: Earth and Environmental Science
Abstract:The aim of this research is to develop a risk mitigation strategy in supply chain process of WestSumatra-Riau toll road pavement material. Data for this study was obtained through brainstormingtechniques, questionnaires, field surveys and literature review. The data was analyzed using Houseof Risk (HOR) method. There were 18 items of risk event's and 21 items of risk agent's identifiedfrom the HOR phase 1, whereas risk agent handling priority data and risk mitigation actions are 19items by using HOR phase 2. The results show that there are 2 (two) risk agents ranked 1 and 2 forthe most critical, namely A1 (poor supplier performance) with ARP of 860 and A2 (Low of ContractorCapability) with ARP of 507, which can cause ± 80% of risk events where the remaining 20% is causedby other agents. There are 2 (two) mitigation actions were obtained from HOR phase 2, namely PA1(appropriate supplier selection method) and PA4 (appropriate contractor selection method) which canprevent...
What problem does this paper attempt to address?