Analysis of Time Acceleration Costs in Level Building Using Critical Path Method

Andrew Ghea Mahardika,Hetty Fadriani,Muntiyono,Salamatul Afiyah,Givy Devira Ramady
DOI: https://doi.org/10.1088/1742-6596/1424/1/012025
2019-12-01
Journal of Physics: Conference Series
Abstract:Abstract The multi-story building construction project was carried out according to the schedule at the time of the initial session’s work. There was a delay in the agreement for the receipt of land which caused work to be delayed. The researcher’s aim is to find out the work time using the Critical Path Method (CPM) method, in this analysis the time from the acceleration of the duration obtained from the CPM, so that in analyzing the estimated normal and up-normal costs of labor wages and the estimated amount of the budget due to the acceleration of implementation time. By making direct observations, and interviewing project team members, the data obtained are used to base analysis. Based on the results of the data obtained and analyzed using CPM. The results of the normal duration of work with the CPM method produce 119 working days, the results of the acceleration of the time done by the CPM method obtained 104 working days. Therefore, using labor analysis, the total cost of normal labor costs is IDR 30,901,500.00 and the total up-normal costs of labor costs are IDR 26,037,000.00. So the results of the analysis, save labor costs of Rp.4,864,500.00. Thus, the total normal cost budget is Rp. 1,337,999,697.00 and the total up-normal cost budget is Rp. 1,333,135,197.00.
What problem does this paper attempt to address?