Multiobjective Programming for Waste Heat Recovery of an Industrial Gas Turbine

DOI: https://doi.org/10.4018/978-1-7998-1710-9.ch003
2020-01-01
Abstract:In gas power plants, the overall efficiency of the generation system plays a key role in ensuring stable and efficient power supply. Terms and conditions of power supply are usually detailed in power purchase agreements (PPA). Current requirements set by PPAs limit the net power produced by the supplier. This creates opportunities for plant optimization efforts to focus on system efficiency—aiming to increase system lifetime with lower operational costs. In this chapter, a gas turbine (GT) system is considered to demonstrate certain features of power plant optimization. Waste heat from the GT exhaust stack is fed into an absorption chiller (AC). The AC cools the air intake at the GT compressor. This cooling reduces the heat rate and increases the GT efficiency. This combined GT-AC system was optimized in a multi-objective (MO) setting while considering power limitations (imposed by the PPA).
What problem does this paper attempt to address?