Activity-based – risk breakdown structure as an initial stage in formulating OHS unit cost analysis in the construction project

E Kusumo,R Arifuddin,R U Latief
DOI: https://doi.org/10.1088/1755-1315/419/1/012143
2020-01-01
IOP Conference Series: Earth and Environmental Science
Abstract:Abstract Implementation of occupational health and safety in a construction project must be applied, referring to existing regulation. Previous research indicates that budget planning is one of the most basic aspects of OHS implementation problems in a construction project. Effective approach to formulating appropriate OHS cost models still needs further effort. This research tries to develop an activity based-risk breakdown structure as an initial stage in formulating the OHS unit analysis model based on the existing unit cost analysis model referring to Regulation of Ministry of Public Work and Human Settlement number 28/2016 about Unit Cost Analysis in Construction Project in Public Work Field. The methodology used in this research is archive analysis and expert judgment on activity based-risk breakdown structure analysis using HIRADC (hazard identification risk assessment determining and controlling) theory that attached to the workers and the project method used in each work unit. This research tries to deliver a simple job risk analysis method as an initial stage in formulating a reference for making a cost safety analysis formula in a construction project.
What problem does this paper attempt to address?
The problem that this paper attempts to solve is the insufficient budget planning in the formulation process of occupational health and safety (OHS) cost analysis in construction projects. Specifically, although existing regulations require OHS budget planning to be included in project contract quotations, there is a lack of technical guidance or procedures to calculate OHS cost units in detail. This has led to the inability to accurately assess the cost of implementing OHS during the project planning stage, thus affecting the review level of occupational safety. To solve this problem, the author proposes an Activity - Based Risk Breakdown Structure (AB - RBS) as the initial stage of formulating an OHS unit - cost analysis model. This method simplifies the work - risk analysis process by directly applying risk analysis to the lowest level of work, that is, work items, thereby providing support for OHS planning, especially providing a reference basis for calculating OHS costs. The methodology in the paper includes file analysis, expert judgment, and the use of the HIRADC (Hazard Identification, Risk Assessment, Determination and Control) theory to analyze the Activity - Based Risk Breakdown Structure. These steps aim to develop a simple and easy - to - understand OHS cost - calculation model that complies with the current work - unit cost - analysis model and relevant laws and regulations. In this way, the research hopes to provide useful input for service providers (contractors/consultants) and service users (project managers/project leaders) when preparing work - unit analysis that includes OHS cost elements.