Bus ultra-short-term load forecasting considering the impact of distributed photovoltaic power supply

Changyong Yu,Mingli Zhang,Qiankun Hu,Heyan Zhu,Li Jiang,Zhe Nan,Fang Li
DOI: https://doi.org/10.1088/1755-1315/440/3/032103
2020-02-01
IOP Conference Series: Earth and Environmental Science
Abstract:Abstract Bus load base is small and volatile, so it is difficult to predict ultra-short-term load. Distributed photovoltaic power supply connected to bus power supply area further increases the uncertainty of bus load and directly affects the prediction accuracy. Aiming at the ultra-short-term load forecasting problem of bus with photovoltaic power supply under complex weather conditions, a method of bus ultra-short-term load forecasting based on feature selection and XGBoost is proposed. Firstly, a high-dimensional feature set is constructed with various influencing factors, and the XGBoost predictor is trained with the original feature set in the typical meteorological day historical data such as rainy and sunny days, and the degree of response between the bus load and the multi-factor is determined during the training process. Then, the MAPE value is used as the evaluation index. Forward search is used to select features to determine the optimal feature subsets of different typical weather day predictors. Finally, according to the selected optimal feature subsets, the optimal XGBoost prediction model for different weather days are established to predict the bus output of different weather days. Experiments on bus data with distributed photovoltaic in a certain area show that the new prediction model has higher prediction accuracy.
What problem does this paper attempt to address?