Heightening of an Existing Embankment Dam: Results from Numerical Simulations

Zhu Yumeng,Guoying Li,Zhankuan Mi,Zhongzhi Fu,Kuangmin Wei
DOI: https://doi.org/10.5772/intechopen.92221
2021-03-31
Abstract:The old dam of the Zhushou Reservoir is a clay core rock-debris dam with a maximum height of 63.4 m. After heightening, the new dam is a concrete-faced rockfill dam with a maximum height of 98.1 m. In the initial design stage, a rigid connection is proposed between the cutoff wall and toe slab. After the concrete cutoff wall is built at the axis of the old dam, a complete cutoff system is composed of cutoff wall, toe slab, and face slab. In this paper, based on the static and dynamic tests of dam materials, the Shen Zhujiang double-yield surface elastic-plastic model is used as the static constitutive model, and the contact friction model is used as the contact surface model. The three-dimensional finite element method is used to simulate the construction filling and water storage process during operation. The simulation results show that the maximum horizontal displacement occurs in the dam body of the old dam and the maximum settlement occurs at the interface between the old and new dams. During the storage period, the cutoff wall will not be damaged, and the tensile stress of the local area at the junction of toe slab and bank slope has exceeded the allowable value for C30 plain concrete, so the reinforcement should be strengthened at this location.
What problem does this paper attempt to address?