A performance evaluation framework for construction and demolition waste management: stakeholder perspectives

Soo Yong Kim,Minh V. Nguyen,Van Truong Luu
DOI: https://doi.org/10.1108/ecam-12-2019-0683
2020-06-04
Abstract:Purpose The purpose of this paper is twofold: first, to develop a performance evaluation framework for construction and demolition waste management (CDWM); second, to investigate feasible and effective strategies to improve the CDWM performance. Design/methodology/approach A review of the literature highlighted a lack of comprehensive research to evaluate CDWM performance of key project stakeholders, like owners, contractors and consultants. After the identification of 22 performance variables through a pilot study, a first questionnaire survey was conducted to investigate the views of respondents toward CDWM performance. The 132 responses were analyzed using factor analysis to determine specific CDWM performance factors, which formed a conceptual performance evaluation framework of CDWM. Furthermore, a practical index (PI) was proposed to integrate the feasibility and effectiveness of CDWM strategies. The values of PI were employed to prioritize CDWM strategies from data collected in a second questionnaire survey. Findings The validated results from factor analysis revealed that the conceptual performance evaluation framework of CDWM consists of six factors; and the attitude toward CDWM emerged as the foremost critical factor. The prioritization of PI values indicated that raising CDWM awareness among construction stakeholders was the most feasible and effective strategy for CDWM. Originality/value This CDWM performance evaluation framework is one of the first to holistically evaluate CDWM from key stakeholder perspectives. In addition, the PI firstly enables quantitative integration of the feasibility and effectiveness of CDWM strategies.
engineering, civil, industrial,management
What problem does this paper attempt to address?