Exploring strategies to reduce moral hazard and adverse selection of Ghanaian public–private partnership (PPP) construction projects

De-Graft Owusu-Manu,Augustine Senanu Kukah,Frank Boateng,George Asumadu,David John Edwards
DOI: https://doi.org/10.1108/jedt-05-2020-0195
2020-08-18
Journal of Engineering, Design and Technology
Abstract:Purpose Conditions of inadequate and asymmetric information when an agent is hired by a principal have resulted in the problems of moral hazard and adverse selection (MHAS) in public–private partnership (PPP) construction projects. The purpose of this study is to explore strategies to reduce MHAS in PPP construction projects. Design/methodology/approach Questionnaires were used to elicit responses from respondents. Mean score ranking was used to rank these strategies while reliability analysis was conducted using Cronbach’s alpha coefficient and level of agreement tested using Kendall’s concordance. Factor analysis grouped the strategies into eight components. Findings From the mean score ranking, monitoring; transfer of risks; screening; managing of construction risks; and increased incentives to control costs were the most significant strategies. The eight components were transparent process and contract, incentives and monitoring, screening and technical assistance, unbundling and benchmarking, funding and small liabilities, information clarification and signaling, risk and contract management and cooperation and finance factors. Practical implications The findings of this study have identified the most significant strategies to reduce MHAS on PPP construction projects to serve as a guide to PPP practitioners in reducing MHAS. Originality/value The output of this research contributes to the checklist of strategies that reduce PPP project failures arising from MHAS and contributes to the development of the agency theory.
What problem does this paper attempt to address?