Take Back Control of Your Capital Project with an EPC 4.0 Strategy

Amish Sabharwal,Greg Pada Pada
DOI: https://doi.org/10.2118/202925-ms
2020-11-09
Abstract:Abstract Objectives/Scope: CapEx Project delivery in the Oil and Gas industry is markedly underperforming other industries. McKinsey and IHS have reported that for projects over $1BN:98% of Projects incur cost overruns or delaysThe average cost increase is 80% of the original valueThe average slippage is 20 months behind original schedule The advent of "Industry 4.0" is highlighted by the adoption of integrated technology and software tools that focus on management of data across entire projects teams. This has enabled a leap in project execution performance in Aerospace, Manufacturing, and Agriculture. This paper investigates how the current Oil and Gas project execution methodologies can also be enhanced to leverage an Industry 4.0 strategy. This approach has been dubbed EPC 4.0. Methods, Procedures, Process Through a process of dissecting existing workflows, business processes, contracting strategies, organizational structures, and information management practices used in capital project execution, the authors have proposed revised practices leveraging digital technology capabilities. These practices take advantage of systems that bring true data integration between all project tools, leveraging a single source of truth that can be visualized in 1D (data), 2D (schematics) or 3D (model), 4D (time) and 5D (cost) enabling project analytics and collaboration between all project disciplines, project teams and project stakeholders. Results, Observations, Conclusions The result is an EPC 4.0 blueprint. A series of recommended best practices that are enabled by moving to a unified data centric strategy that will enhance project outcomes. The paper will cover the impact that EPC 4.0 has onContracting Methodologies and Project Team StructuresData Management and data centric workflows/business processesConceptual/Front End Design MaturityEnhanced project oversight, reporting and managementProject collaboration within teams and between organizationsEnhanced Change ManagementPreparation for handover to operations Early adopters of an EPC 4.0 strategy are seeing immediate results. Typical savings are a 50% reduction in engineering in costs or 5% reduction in CapEx. In addition, higher quality output from engineering flows through to procurement, construction, and commissioning yielding a further 10% CapEx savings. More importantly, predictability in project outcomes have significantly increased with teams more effectively able to mitigate and manage cost overruns and schedule delays. Novel/Additive Information The key innovation at the heart of the of EPC 4.0 strategy is the stripping away of the project practices that have built up over the years to mitigate the complexity and volume of information generated during capital project execution. By centralizing and simplifying data management, project contributors can focus on their principal role. For example, engineers can focus on engineering tasks, not on information management tasks.
What problem does this paper attempt to address?