Abstract:In order to increase the resilience of distribution systems against high-impact low-probability (HILP) events, it is important to prioritize the damaged assets so that the lost loads, especially critical and important loads, can be restored faster. In addition, correctly predicting the number of repair teams during critical times contributes to restoring the network to the initial resilience level. For this reason, this paper discusses the prioritization of electricity supply lines for evaluating the number of required repair teams. To this end, the economic value of distribution system lines has been considered as a criterion representing the sensitivity of the network to hurricanes. The modeling is based on value, in which the load value, failure probability of the poles, fragility curve, duration of line repair by the maintenance team, and the topology factor have been considered. This is so that the significance of the demand side, the failure extent and accessibility of the lines, the importance of time, and the network configuration are considered. The results provide a list of line priority for fault resolution, in which the topology factor has a larger effect. The number of repair teams required to restore critical and important loads is determined from this model. This modeling has been tested on an IEEE 33-bus network. Keywords: Resilience, distribution systems, asset evaluation, restoration prioritization, repair team
Systems and Control,Signal Processing