Flood risk mapping of the Sukamahi Dam failure with overtopping scenario

W G Prakoso,B Rahman,H Purwanti,P Irawan
DOI: https://doi.org/10.1088/1755-1315/622/1/012006
2021-01-01
IOP Conference Series: Earth and Environmental Science
Abstract:Abstract Sukamahi dam at Cisukabirus river, part of the upper Ciliwung watershed, located at Bogor regency. Sukamahi dam was designed for flood reduction purposes, especially for the downstream region, e.g., City of Bogor, Bogor regency, City of Depok, and Jakarta. Sukamahi dam will give flood reduction 13.53 m 3 /s with probability exceeded 2 %, and time to concentration (tc) for peak discharge (Qp) at least 4 hours longer than existing condition. Despite providing the benefits of flood control, the construction of dams also has the potential to increase the risk, i. E if a dam fails due to overtopping. Based on the Sukamahi dam flood failure scenario, dam failure has the potential to occur if the bottom outlet ( tunnel) and spillway fail when flood discharge with a 1000 year return period or more occur. Modeling of Sukamahi dam failure using 2 D HEC-RAS with unsteady flow analysis from sta 0 + 000 to STA 8 + 500 produces a map of inundation area of 36.89 Ha. The flood flow velocity is reaching 8.43 m/sec with a maximum flood flow depth of 69.72 m.
What problem does this paper attempt to address?