The application of BIM technology in the whole life cycle of a project to explore

Qiaofeng Wang,Xu Huang,Lijun Li
DOI: https://doi.org/10.1088/1755-1315/638/1/012056
2021-02-01
IOP Conference Series: Earth and Environmental Science
Abstract:Abstract In recent years, public buildings have been paying more and more attention to the integration of aesthetic and cultural values, resulting in complex and diverse architectural forms and difficult construction. The Taiyuan Water Sports Center is similar to a sailboat in shape, with a reinforced concrete cylinder and steel truss suspension structure, a complex building system, and high installation accuracy requirements. BIM technology was introduced in the pre-planning stage of the project to explore the application value of BIM technology in the whole life cycle of the project, and the results showed that BIM technology avoided 52 collision problems, found more than 50 various problems in the deepening design stage, completed 15 3D technology transfer, saving 30% of the measurement labor cost, reducing the rework rate and later equipment operation and maintenance costs.
What problem does this paper attempt to address?