Supplemental Environmental Impact Assessment
Mélanie Auffan,Catherine Santaella,Alain Thiéry,Christine Paillès,Jérôme Rose,Wafa Achouak,Antoine Thill,Armand Masion,Mark Wiesner,Jean-Yves Bottero,Florence Mouchet,Périne Landois,Floriane Bourdiol,Isabelle Fourquaux,Pascal Puech,Emmanuel Flahaut,Laury Gauthier,Malgorzata J. Rybak-Smith,Youngjun Song,Michael J. Heller,David Holmes,Benjamin L. J. Webb,Tao Sun,Theresa S. Mayer,Jeffrey S. Mayer,Christine D. Keating,Amitabha Ghosh,Ilya V. Pobelov,Chen Li,Thomas Wandlowski,Michael G. Helander,Zhibin Wang,Zheng-Hong Lu,Francesca Carpino,Larry R. Gibson,Dane A. Grismer,Paul W. Bohn,Nezih Pala,Mustafa Karabiyik,Alexandra Porter,Eva McGuire,Guoqiang Xie,Alejandro Lopez-Bezanilla,Stephan Roche,Eduardo Cruz-Silva,Bobby G. Sumpter,Vincent Meunier,Michael J. Laudenslager,Wolfgang M. Sigmund,Neal A. Hall,CJ Kim,Guoxing Wang,Robert J. Greenberg,Chimaobi Mbanaso,Gregory Denbeaux,Claire Coutris,Erik J. Joner
2016-01-01
Abstract:The development objective of the Anhui Xuancheng Infrastructure for Industry Relocation Project for China is to contribute to the economic, social, and environmental sustainability of the project area in the Xuancheng economic and technological development zone. Some of the negative impacts and mitigation measures include: (1) establish road diversion and temporary access plan and establish enough traffic diversion indication plates; (2) equipment with high noise and vibration should be strictly prohibited to work in rest time at noon or night; (3) the domestic sewage should be drained to the urban sewer network or drained extremely with surface runoff after pre-treatment via the sedimentation tank or septic tank; (4) improve the road management and pavement maintenance; and (5) garbage should be collected manually at regular intervals and finally dumped into the garbage landfills through refuse transfer station.