Key Takeaways from Mobile, Self-Contained Multiphase Pumping Package Designed for Efficient Unloading and Production Boosting of High Gas Volume Fraction and Heavy Liquid Wells
P. Maximov,K. Yudin,P. Valdivia,D. Kurimov,A. Nurmukhanbetov,E. Putra,N. Shugayev,A. Benther,H. Hajjoubi,A. Ivkin,A. Bekishev
DOI: https://doi.org/10.2118/217616-ms
2023-11-21
Abstract:Tengiz Field has been in production for over 30 years period and as a result, some wells are not capable of producing fluids to the current system pressure. Several wells were shut in because of insufficient wellhead pressure, changes in well flow regimes, and in reservoir conditions leading to unexpected well loading and unplanned shutdowns. Tengizchevroil (TCO) has historically unloaded wells primarily by depressurizing the production line connected to the loaded well, lowering the wellhead pressure, and enabling the well to start up by itself without the need for further assistance. To kick off the well when flowline depressurization is insufficient, a fullbore nitrogen bullhead is injected through the kill line. This makes the hydrostatic column lighter and enables the reservoir to push it more easily. Both methods are costly and pose HSE risks associated with equipment movement, production line depressurization, pressure management, Joule-Thomson effect, brittle fracture risks, H2S gas leak risks, and CO2 and methane emissions due to fuel gas flaring. The Multiphase Pumping Package (MPP) project was initiated to develop a new solution to unload wells that stopped producing. The project required an agile solution with a high level of mobility, ensuring safe and faster deployment between metering stations reducing idle time, and minimizing the loss of production.
This paper shares lessons learned from using a Multiphase Pump (MPP) for unloading and boosting wells with heavy liquid at the bottom and gas at the top. It covers the MPP's fit-for-purpose design for mobile and self-contained applications, as well as its ability to operate under extreme conditions like high GVF (up to 98%) and heavy liquids. The paper will cover the following aspects of MPP applications:
The design aspects and criteria for MPP, including business requirements and limitations. MPP's surface tie-in locations and its mobility between different sites Operational challenges during well startups and unloading, as well as practical methods developed, and lessons learned.
Environmental Science,Engineering