Operation Performance Evaluation of Urban Rail Transit PPP Projects: Based on Best Worst Method and Large-Scale Group Evaluation Technology

Yuning Wang,Yingzi Liang,Cong Li,Xinyuan Zhang
DOI: https://doi.org/10.1155/2021/4318869
IF: 1.843
2021-09-29
Advances in Civil Engineering
Abstract:Urban rail transit project is a kind of typical operating public project. Adopting the PPP model can alleviate local financial pressure and improve capital use efficiency. However, many existing urban rail transit PPP projects have fallen into the dilemma of cost overrun, schedule delay, and poor product quality. The lack of reasonable project performance evaluation is considered as an important cause. This research first clarifies the meaning and characteristics of project performance evaluation by comparing and analyzing several basic concepts and relationships. Secondly, an operation performance evaluation system based on urban rail transit PPP project of a three party is constructed from a multistakeholder perspective. Finally, the best worst method and large-scale group evaluation technology are used based on the comparison of multistakeholder evaluation application scenarios and evaluation methods. A quantitative model is constructed to evaluate the operating performance of urban rail transit PPP projects and is tested and explained by a specific case study. Most current studies generally focus on the earlier stage of project performance, and this article mainly discusses and researches the operation performance of PPP projects. There, suggestions are provided for the operation performance evaluation theory and urban rail transit PPP project practices. This article focuses on the operation performance evaluation of PPP projects.
construction & building technology,engineering, civil
What problem does this paper attempt to address?