Strategic workforce and project planning for engineering automotive production systems: tackling the transition to electric vehicles
Maximilian Kolter Martin Grunow Rainer Kolisch Thomas Stäblein a Department of Operations and Technology,Technical University of Munich,TUM School of Management,Munich,Germanyb Mercedes-Benz AG,Sindelfingen,GermanyMaximilian Kolter is a PhD candidate at the Chair of Operations Management at the TUM School of Management of the Technical University of Munich. Prior to pursuing his PhD,he received a MSc degree in industrial engineering from the University of Arkansas as a Fulbright grantee. Besides academia,Maximilian Kolter gained experience in the automotive industry. He did an apprenticeship in body manufacturing at BMW and worked in several positions for Webasto a tier-one supplier. In his research,he uses operations research methodology to solve supply chain and scheduling problems.Martin Grunow is a Professor of Production and Supply Chain Management at the Technical University of Munich's TUM School of Management in Germany. He received his MSc degree in industrial engineering and his PhD from Technical University Berlin. After working in the R&D department of Evonik Degussa,Martin Grunow was a Full Professor of Operations Management and Department Head at Technical University of Denmark before joining TUM. In his research,he develops planning and scheduling methodology for manufacturing,logistics,and supply chain management. He has a special interest in the automotive and electronics sector as well as in the process industries,including chemicals,pharmaceuticals,and food.Rainer Kolisch is a professor in the Operations and Technology Department of the School of Management at the Technical University of Munich,Germany. His research focuses on scheduling,service operations,and project management. He was editor-in-chief of OR Spectrum and he currently serves on five editorial boards.Thomas Staeblein is the Head of Data Operations at Mercedes-Benz. For 20 years he has been with the company in senior management positions leading teams in Production Engineering,Project Scheduling,and Research & Development in Germany,China,and the US. He holds a PhD in Engineering from TU Clausthal and has been a visiting researcher at the University of Cambridge. His research focuses on designing and implementing lean production systems,enabling AI for autonomous driving with data collection operations,and managing product variety. In addition to his role at Mercedes-Benz,Thomas has been an Adjunct Lecturer at the Technical University of Munich since 2011.
DOI: https://doi.org/10.1080/00207543.2024.2371097
IF: 9.018
2024-07-13
International Journal of Production Research
Abstract:Car manufacturers are electrifying their product portfolios as a reaction to restrictions imposed on car emissions. This leads to additional product introductions of battery electric vehicles to the existing portfolio of internal combustion engine vehicles. For each introduction, car manufacturers must engineer the corresponding production systems. The engineering of these production systems is executed as projects that consist of designing, building, installing, and testing, requiring different types of engineers. Car manufacturers deploy an engineering workforce and outsource work to engineering service providers. In practice, workforce planning, project planning, and outsourcing are performed sequentially using spreadsheets. However, portfolio electrification increases the complexity of planning, calling for more advanced methods. We formulate an integrated workforce and project planning problem (mixed-integer programme) to minimise outsourcing and perform an experimental study using realistic data representing different prevalent strategies for portfolio electrification. Our approach significantly reduces outsourcing and increases workforce utilisation compared to current industry practice for a wide range of workforce sizes. Furthermore, we investigate the benefit of partially aligning the current practice with our integrated approach. Optimising outsourcing alone while maintaining the sequential planning process reaps 70% to 80% of the potential benefits, and integrating workforce or project planning achieves up to 90%.
engineering, industrial,operations research & management science, manufacturing