Abstract:With Demand Response (DR) and Distributed Energy Resource (DER) assets’ increasing presence at the distribution level, distribution utilities are faced with increasing challenges – ranging from power flow reversals, voltage fluctuations, and phase imbalances, among others. To efficiently manage the impact of these new assets, collectively referred to as Grid-Edge Resources, it is worth examining what underlying grid architecture, systems or solutions would be required. Currently, most distribution grid operators rely on Distribution Management Systems (DMS) and Advanced Distribution Management Systems (ADMS) to gain visibility and the capability to control the grid and grid-connected assets. Now the question arises, should the current grid architecture be maintained and can the technology for DMS/ADMS simply be upgraded and extended to include tools and applications to manage DERs? Or, would a new technology stack involving separate Distributed Energy Resource Management System (DERMS), interfaced with the existing DMS/ADMS, provide the required visibility and control capability to manage the entire grid down to customer-side of the meter and all DERs, while providing DER owners and operators the ability to manage their assets based on incentive signals provided by DERMS? Several factors impact the decision on how to move forward on future grid management architecture. These factors include the fact that most DERs are owned by customers, are located in grid segments beyond DMS/ADMS reach, and may have local Power Purchase Agreements (PPA) and contractual requirements. Another factor is the distribution utilities’ traditional separation between Customer Services, where all customer-related data are managed and maintained, and Distribution Operations, where all distribution grid data required for grid operations are managed. Other considerations are the tariff-related rules and requirements for DER participation, and the various capacity, energy and other service provisions required to support grid operations. Complicating the decision is the fact that these tariff rules and requirements are regional, utility-specific, and vary from utility to utility.
Engineering,Environmental Science
What problem does this paper attempt to address?