ILD MC production for detector optimization

Akiya Miyamoto,Hiroaki Ono
DOI: https://doi.org/10.48550/arXiv.1902.02516
2019-02-07
Instrumentation and Detectors
Abstract:A large scale Monte Carlo production has been pursued since spring 2018 for the ILD detector optimization studies based on physics benchmark processes. A production system based on ILCDirac has been developed to produce samples in timely manner. The system and its performance are presented.
What problem does this paper attempt to address?