A Cluster Partition Based Optimal Planning Method of Distributed Energy Storage Systems

Yongqing Liu,Mingjie Sun,Yingjun Hou,Weizhen Yap,Liyang Liu,Fushuan Wen
DOI: https://doi.org/10.1109/icopesa61191.2024.10743231
2024-01-01
Abstract:With the ever-increasing penetration of renewable energy generation in power systems, distributed energy storage systems (DESSs) play a more important role in power system planning and operation. DESSs are capable of smoothing load fluctuations and enhancing the accommodation capability for renewable energy generation, and appropriate planning of DESSs is vital for fully exploring their potentials. Given this background, by employing the cluster partition method, a bilevel configuration optimization model of DESSs is first presented to determine the optimal locations of DESSs and solved by the well-established genetic algorithm (GA). In the developed model, both economic and technical factors in power system planning are considered. Then, a time-sequence-based fuzzy evaluation model is established to select the optimal DESSs integration scheme by quantitatively evaluating the reliability, economics and power quality of DESSs integrated distribution systems. Finally, a modified version of the IEEE 33-node distribution system is employed to demonstrate the proposed optimal planning method of DESSs.
What problem does this paper attempt to address?