Optimization of AGV Scheduling in Automated Terminals Based on Rolling Time-Domain Control

Hongxiang Shao,Junbo Ge,Yingqi Xi,Feizhou Zhang,Jiang Li
DOI: https://doi.org/10.1109/ngdn61651.2024.10744174
2024-01-01
Abstract:With the expansion of maritime trade, the automation of container terminals has become a consensus among operators worldwide. The AGV (Automated Guided Vehicle) operation system is highly coupled with the site loading and unloading equipment and has the highest complexity, making it one of the core factors restricting terminal operational capacity. Based on the "Global Job Shop" strategy for AGV scheduling, this paper uses the "rolling time-domain control" method to flexibly determine the scheduling trigger timing. The optimization objective is to minimize the total ineffective waiting time between AGVs and loading and unloading equipment. It establishes a collaborative scheduling model for quay cranes and yard cranes and uses an improved particle swarm algorithm to complete the solution. The effectiveness and feasibility of the scheduling model and algorithm are verified.
What problem does this paper attempt to address?