The Beam Commissioning of SC Cyclotron-based Proton Therapy System with Fast Energy Selection and Precise Gantry
Tianjue Zhang,Chuan Wang,Zhiguo Yin,Xianlu Jia,Yang Wang,Wei Fu,Jingyuan Liu,Zhaojun Jin,Hongji Zhou,Suping Zhang,Hongru Cai,Gaofeng Pan,Xiaofeng Zhu,Jun Lin,Bohan Zhao,Qiankun Guo,Chuanye Liu,Rui Xiong,Aolai He,Tianyi Jiang,Mingzhi Hu,Qiqi Song,Aoxuan Ding,Shangmeng Jiang,Ping Liu,Fangdi Yang,Xiesi Huang,Zhichao Chu,Xiaoxue Xia,Zheyuan Zhang,Ling Qin,Yongjun Ma,Ziyi Cheng,Zheng Xu,Hao Le,Youwen Zhang,Xi Wang,Zhan Liu
DOI: https://doi.org/10.1109/TNS.2024.3440339
IF: 1.703
2024-01-01
IEEE Transactions on Nuclear Science
Abstract:Since 2016, a superconducting cyclotron-based proton therapy system has been designed, constructed, installed, and commissioned at the China Institute of Atomic Energy (CIAE). It includes a superconducting cyclotron CYCIAE-230, a beamline with a fast energy selection system, a 360 ° gantry, and a pencil beam scanning nozzle. And there is another beamline for proton irradiation, for example, used for space science research. This paper will briefly introduce the overall design of the PT system. The results of the beam commissioning, from the cyclotron to the nozzle, will be emphasized. As early as Sept. 2020, the proton beam's energy accelerated by the superconducting cyclotron reached 231MeV; the 360° gantry had been tested by experts and found an isocenter better than 0.3mm at any angle. After obtaining comprehensive commissioning permission in late November last year, we finished the test of the PT system with the following results: the energy of the cyclotron is 242 MeV, the energy range of the degrader is 71 MeV~242MeV, the maximum average beam intensity extracted is 462 nA, and the measured efficiency of the beam from the central region to outside the cyclotron is 74%; it is 45 ms the time interval varying one energy step of the degrader and 51 units of the magnets. The results will be presented in detail in the paper.