Considering the Peak Power Consumption Problem with Learning and Deterioration Effect in Flow Shop Scheduling

Dan-Yang Lv,Ji-Bo Wang
DOI: https://doi.org/10.1016/j.cie.2024.110599
2024-01-01
Abstract:This paper investigates the permutation flow shop scheduling problem with peak power constraints under sequence-dependent setup time, learning, and deterioration effects to minimize the makespan, where the peak power consumption satisfies a given upper bound at any time. We establish relevant mathematical models based on the characteristics of the scheduling environment and set up five setup time-based heuristics, including the earliest start time, the latest setup time based on balance job-machine, latest setup time based on balance machine-job, latest setup time insert based on balance job-machine, and latest setup time insert based on balance machine-job. Similarly, a hybrid genetic algorithm combined with simulated annealing is proposed to prevent premature trapping in local optima. The algorithms are evaluated through a large number of data experiments, and the results show that it can effectively solve this scheduling problem.
What problem does this paper attempt to address?