Breaking the Limit on the Number of Robots Through the Conflict-Free Scheduling in Robotic Mobile Fulfillment Systems

Yangjun Sun,Ning Zhao,Longwei Tang,Lei Luo
DOI: https://doi.org/10.1109/tase.2024.3420107
IF: 6.636
2024-01-01
IEEE Transactions on Automation Science and Engineering
Abstract:The robotic mobile fulfillment system (RMFS) utilizes robots to automate logistics handling. Although robots can replace workers, there are serious limitations and conflicts that make the system inefficient, resulting in a limited number of robots in the system. A conflict-free scheduling approach is studied, demonstrating better system efficiency, breaking the limit on the number of robots, and accommodating more robots in operation compared to the traditional strategy. A mathematical model aiming to minimize the total completion time is presented. An A $<^>\ast$ algorithm is modified for path planning, and an approach with two avoidance rules and six priority rules is proposed for conflict-free scheduling. Based on a case study involving four layout scales, the conflict-free scheduling is suitable for layouts with a higher number of robots, pillars, and a unidirectional path networks. More robots can be accommodated within the system, and even a threefold increase (45 to 150) will not result in a decrease in system efficiency, reducing the total completion time by 49.3%. In the largest layout system, the number of robots doubled (160 to 320) and the total completion time was reduced by 26.1%. This indicates the great potential for the conflict-free scheduling approach in future logistic applications, which could reduce resource consumption for scheduling and increase system efficiency.
What problem does this paper attempt to address?