Service-oriented bi-objective robust collection-disassembly problem with handling module

Xin Liu,Feng Chu,A. Dolgui,Feifeng Zheng,Ming Liu
2019-01-01
Abstract:The collection-disassembly problem plays an important role in the reverse supply chain management. The focus of the problem is to coordinate the activities associated with the collection and the disassembly of the end-of-life (EOL) products. Most existing works consider the problem under deterministic settings. However, in practice, the demands of components of EOL products that can be reused may be uncertain, due to various factors. Besides, it is usually difficult to obtain the probability distribution of the uncertain demands, as the historical data may be inadequate. This paper investigates a stochastic collection-disassembly problem, in which handling modules of disassembly system, corresponding to different disassembly capacities, have to be selected and partial distributional information of component demands (i.e., the mean and covariance matrix of demands) is known. The objectives are to minimize the system cost and to maximize the average customer service level (i.e., the average probability of meeting each demand) simultaneously. For the problem, a novel distributionally robust bi-objective formulation is proposed. Based on the proposed model, the Monte carlo simulation and an ambiguity set, a sample average approximation (SAA) model and an approximated mixed integer programming (MIP) model are constructed. Then the two approximated formulations are solved, via the (cid:15) -constraint framework,
What problem does this paper attempt to address?