Correction to: Analysis on the Evolution of Rock Block Behavior During TBM Tunneling Considering the TBM–Block Interaction
Zixin Zhang,Shuaifeng Wang,Xin Huang
DOI: https://doi.org/10.1007/s00603-018-1501-6
IF: 6.518
2018-01-01
Rock Mechanics and Rock Engineering
Abstract:Equations 3, 4, 5, 11, 13, 15, 17, 18, 19, 20, 22, 23, 24, 25, 26, 27 and 31 are reported incorrectly. The correct equations are given below.