AGV Scheduling Problem in Automated Container Terminals with Time Window Under Transfer Platform Capacity Constraint.

Linman Li,Yuqing Li,Zhen Chen,Ran Liu,Ershun Pan
DOI: https://doi.org/10.1109/IEEM58616.2023.10406538
2023-01-01
Abstract:Given the operation plan of the quay crane (QC) and yard crane (YC), a fleet of automated guided vehicles (AGVs) can be scheduled to complete all the requested container tasks in a certain order. Due to the limit of one transfer platform (TP), when the AGV arrives after the established release time of container task in the QC/YC plan, it will cause crane waiting and may affect the operations of the subsequent container tasks. However, we can reduce the production loss caused by crane waiting and minimize the total cost by the decision of the number of AGVs attendance and their scheduling scheme. This is exactly what the AGV scheduling problem with time window under TP capacity constraint (VSPTW-TP) aims to determine. To address this issue, we formulated a mixed-integer programming (MIP) model and designed an ant colony optimization algorithm combined with local search (ACO-LS) to solve the model. Computational results on a small-scale instance from Yangshan Port IV showed the efficacy of the suggested approach.
What problem does this paper attempt to address?