Discussion on "optimal Generator Start-Up Strategy for Bulk Power System Restoration"

Zhenzhi Lin,Fushuan Wen
DOI: https://doi.org/10.1109/tpwrs.2012.2200772
IF: 7.326
2012-01-01
IEEE Transactions on Power Systems
Abstract:The authors present an interesting and practical start-up strategy for generators during power system restoration. An efficient algorithm based on the mixed integer linear programming (MILP) is proposed to seek the optimal generator start-up sequencing. However, the discussers would greatly appreciate the authors' responses on the following aspects stated in the paper.
What problem does this paper attempt to address?