Probabilistic Production Simulation Including Small Hydroelectric Plants

Jianxue Wang
2004-01-01
Abstract:The probabilistic production simulation is an important tool to the price prediction and generation schedule in power market. However, the traditional approach may initiate more error in exchanging energy between hydroelectric generating unit and the adjacent thermal generating unit. If hydroelectric plant's operation capacity is much less than the thermal unit's capacity, the error of the production simulation will be significant. Furthermore the traditional model of hydroelectric plant without reservoir neglects the probabilistic fluctuating flood flow, which will also make errors . All the above errors must impact the precision of the simulation for the system including many small hydroelectric plants. To improve the accuracy of the simulation, the paper generalizes the traditional probabilistic production simulation, establishes a new approach including small hydroelectric plants inside the region and large power resources outside the region. Based on the data of a real regional power system, simulation analysis has been done with a satisfactory accuracy and efficiency.
What problem does this paper attempt to address?