Light Shock Controlled Blast Technology for Tunnel in Urban Dense-Constructed Area

Junwen Zhu
2012-01-01
Abstract:Beijing east road No.1 tunnel in Guiyang is characterized by shallow buried and undercrossing dense-constructed buildings such as substation,according to its characteristics,high precision digital electronic detonator,which has 1ms quantity difference and 0.01ms error precision as well as the random segmentation technology by program,is used to realize high-precision wave phase interference of detonation waves caused by different blasting holes with several blasting time delay,it is proposed that 5-8ms blasting delay time can make sure that wave phase interference achieves the purpose of light shock.Compared with conventional millisecond delay detonator(1ms errors,20 kinds of fixed segments),the number of this technology’s segments are unlimited and can be arbitrarily arranged,which provides a higher accuracy.Determined delay difference quantities can guarantee the effective inerference and platykurtosis of the detonation wave.Blast monitoring indicates that the blasting shock speed of substation is controlled in less than 0.5cm/s by the implementation of this technology,less than 2.1cm/s,the measured value of conventional millisecond delay detonator blasting with the same dose,so that it can ensure the safety of the substation.The conclusions can provide a reference for similar projects.
What problem does this paper attempt to address?