3-D FEM Analysis for Surrounding Concrete of Steel Spiral Case Keeping Internal Pressure During Construction

Sanbao Lin
IF: 2.4
2002-01-01
Journal of Hydraulic Engineering
Abstract:The surrounding concrete of steel spiral case in the power station of Three Gorges Project is constructed by means of keeping a specific level of internal pressure during construction.For analyzing the contact behavior of the interface between the steel spiral case and its surrounding concrete,the numerical simulations of the construction process during winter or summer season are carried out with 3\|D FEM separately.The variation of the gap and the interaction force between the steel spiral case and its surrounding concrete in different opeation stages and different seasons are studied.The calculation result shows that the effect of temperature on the interacting force is significant.The effect of reducing the interacting force in the summer season during high impounding water level by means of elevating the internal water temperature in case of concreting in winter season and the effect of reducing the gap in winter during low impounding level by means of reducing the internal pressure in the case of concreting in summer season are studied.
What problem does this paper attempt to address?