Green Scheduling in Permutation Flow Shop Environment

Chao Lu,Liang Gao,Xinyu Li,Lvjiang Yin
DOI: https://doi.org/10.1007/978-981-99-6987-6_3
2023-01-01
Abstract:Due to the wide range of industrial applications, permutation flow shop scheduling problems (PFSPs) have attracted wide attention. The majority of research, however, typically ignores setup and transportation time, which consequently results in a significant gap between theoretical study and practical application.
What problem does this paper attempt to address?