Prospecting Company No.3 Position No.2 Well Heat-supply Engineering Design Project Optimization Analysis
Xiaorong Gao
2006-01-01
Abstract:By analyzing the interrelated concept of geothermal heat-supply,one could establish a highly effective utilization of geothermal energy.This was done through a series of implemented channels,basic engineering data.This included geothermal heat-supply project,natural gas adjustable peak,heat pump configuration as well as the implementation of finalassembly project from the technical and economic aspects.This would optimize and fine-tune project.In this way,the Prospecting Company No.3 Position.No.2 Well Heat Supply Project would provide an optimal scheme.It would improve the rate of geothermal utilization in the area.
What problem does this paper attempt to address?