Biodiversity Risk Assessment:Methods and Case Study

Hu Ding
2014-01-01
Abstract:Attempts were made to define biodiversity risks,analyze their sources,work out principles and hierarchy for establishment of a biodiversity risk assessment index system and then to build up the system.Biodiversity risk assessment was performed of 2 376 county-level administrative units,all over China.Results show that generally R(risk value) varies in the range between 0.005 9 and 0.828 3,and is less than 0.3 in most areas.High risk areas are located mostly in Guangxi,Yunnan,Sichuan,etc.,with R being higher than 0.329 1,while low risk areas are distributed mainly in Inner Mongolia,Shanxi,Shaanxi,etc.,with R being lower than 0.056 8,and moderate risk areas in Northeast China and North China.In the areas,the most abundant in biodiversity(TS ≥0.295 8),there are still 38 county-level units moderate in R,owing mainly to the greater area of nature reserves and smaller pressure,with average E R being 0.290 6,and average R P being 0.142 3.However,in the areas,the poorest in biodiversity(TS ≤0.050 2),although there are 22 units with R P being quite high with 0.470 4 on average and 145 units that do not have any nature reserve,while as a whole their R are not so high,with average being 0.057 0 and 0.048 1,respectively.
What problem does this paper attempt to address?